Home 
Mail Subscribe
Contact

 
Overview
Caledon
GCM
Mongolia Coal
 
. . . the energy                       
Company focused         
on developing             
coal and uranium      
  projects               
     
 


    UNION THERMAL COAL PROJECT  (Central Mongolia)

------------------------------------------------------------------------------------------------------------------------------------


The Union coal project is located in Central Mongolia only 130km south of Ulaanbaatar. The project is located only 14km from a rail siding where coal is currently being loaded to supply Ulaanbaatar’s three power stations (~5Mt/year).

The JV is currently talking with adjacent license holders looking at combining resources to enhance the project.

  • Micromine Consulting evaluated the results of the drilling for Polo and defined a NI 43-101 compliant resource of 94.7 Mt Measured and Indicated and 38.4 Mt Inferred categories of coal.
  • The main coal seam at Union is up to 80m thick, crops out at surface and results of drilling indicate potential for large scale, multi bench, open pit mining with low strip ratios.
  • The size and quality of the resources within the JV’s licences at Union have the potential of supporting a significant size coal or gas fired power station for more than 20 years, supplying coal and electricity to domestic and Chinese markets.

The JV is currently talking with adjacent licence holders looking at combining resources to enhance the project.

 
   COAL PROJECTS
 
Erds Project
Union Project
South Gobi
 
 
   MONGOLIA COAL
 
   
  LINKS SITE MAP
  Coal   Uranium   Home The Company Operations Investors Company News Contact
  Caledon Resources plc

GCM Resources plc

Peabody Energy Corporation
Extract Resource Limited    
  2009 Annual Report and Circular Interim Report for the 6 months to December 2009
             
  Copyright © 2010 Polo Resources Limited